Architectural Control Committee (ACC)

Photos by Sue Chesnut, Michael Wasgatt, Jeff Gutekunst, Jim McConnell, Ted Ray and Others.

Architectural Control Committee (ACC)

acc@crystal-lakes.org


Architectural Control Committee Charter

Additional Information


Please make sure you have completed the following before submitting any paperwork for approval to the ACC: 

  • Read and understand the Architectural Guidelines
  • Prior to site inspection, building site dimensions must be clearly staked out.
  • If a second inspection is required, there will be a fee.
  • All applications must be signed on both sides by the owner.
  • All applications must include a plot plan with setback dimensions.
  • All applications which are for structures and fences must include color samples of the material to be used (siding, roofing, fence)
  • Please submit completed application to the Office 15 days prior to the next ACC meeting
    (ACC meets the first Saturday of every month at 1:00 pm in the Wapiti Center)

 

Please visit the Resource Center/Documents for the following documents:

  • CLRRA Architectural Requirements
  • CLRRA Construction Application
Share by: